8D解决法--8D solution

[复制链接]
 楼主| 发表于 2023-10-11 13:40:27 | 显示全部楼层
3-开发临时性控制措施
定义、验证和执行临时控制行动,保证在永久纠正措施实施前,将问题与内外部客户隔离。
采用ICA作为暂时性的问题解决对策~隔离问题

 楼主| 发表于 2023-10-11 13:41:03 | 显示全部楼层
3- Develop temporary control measures



Define, verify, and execute temporary control actions to ensure that issues are isolated from internal and external customers before permanent corrective measures are implemented.



Using ICA as a temporary problem-solving strategy~Isolation issues

 楼主| 发表于 2023-10-11 13:43:02 | 显示全部楼层
4-确定问题根本原因
寻真因如求医问诊,误诊或诊断不全,后患无穷。确定根本原因的主要工具:

                               
登录/注册后可看大图

 楼主| 发表于 2023-10-11 13:45:20 | 显示全部楼层
4- Determine the root cause of the problem



Seeking the true cause is like seeking medical consultation, misdiagnosis or incomplete diagnosis, and the consequences are endless. Main tools for identifying root causes:

 楼主| 发表于 2023-10-11 13:46:44 | 显示全部楼层
5-定义并验证根本性解决措施
当根本原因找出后,长期对策往往应运而生,但是如何针对性的制定最佳改善对策,以避免问题再发,仍需要整个团队讨论决议

 楼主| 发表于 2023-10-11 13:48:16 | 显示全部楼层
5- Define and validate fundamental solutions



When the root cause is identified, long-term countermeasures often emerge, but how to develop the best targeted improvement measures to avoid recurrence still requires the entire team to discuss and make decisions


 楼主| 发表于 2023-10-11 13:49:10 | 显示全部楼层
6-确认与实施根本性解决措施
长期对策可以改善或监控不良现象,是亡羊补牢的纠正措施;

而预防再发着重于消除潜在的不合格或者发生趋势变化的原因,属未雨绸缪的改善方法

 楼主| 发表于 2023-10-11 13:49:52 | 显示全部楼层
6- Confirm and implement fundamental solutions



Long term countermeasures can improve or monitor adverse phenomena, and are corrective measures to make up for the shortcomings;
Prevention of recurrence focuses on eliminating potential nonconformities or causes of trend changes, which is a proactive improvement method

 楼主| 发表于 2023-10-11 13:50:55 | 显示全部楼层
7-预防类似问题的重复发生
改善措施定义完成后,应长期监控从员工反馈、数据分析、现场确认等方面查核措施执行力及有效性。

最常用也最有效的方法即为改善前后不良率对比

 楼主| 发表于 2023-10-11 13:52:24 | 显示全部楼层
7- Preventing the recurrence of similar problems



After the definition of improvement measures is completed, long-term monitoring should be conducted to verify the execution and effectiveness of measures from aspects such as employee feedback, data analysis, and on-site confirmation.

The most commonly used and effective method is to compare the defect rate before and after improvement

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|QPDCA平台自律公约|QPDCA质量论坛 ( 苏ICP备18014265号-1 )

QPDCA质量论坛最好的质量管理论坛 GMT+8, 2024-5-19 02:03 , Processed in 0.097978 second(s), 14 queries , Gzip On.

无锡惠山区清华创新大厦901室0510-66880106

江苏佳成明威管理咨询有限公司 版权所有

快速回复 返回顶部 返回列表