找回密码
 立即注册

QQ登录

只需一步,快速开始

楼主: gaowenhua

实验室改善 Laboratory Improvement

[复制链接]
 楼主| 发表于 3 天前 | 显示全部楼层
安全管理强化
  • 风险评估:对化学品、生物样本、辐射、高温高压设备进行风险评估。
  • 应急预案:制定泄漏、火灾、触电等应急预案,并定期演练。
  • PPE管理:确保防护用品(手套、护目镜、实验服)充足、合规、正确使用。
  • 废弃物管理:分类收集、合规处置(尤其危废)。

 楼主| 发表于 3 天前 | 显示全部楼层
Strengthening safety management
Risk assessment: Conduct risk assessments on chemicals, biological samples, radiation, and high-temperature and high-pressure equipment.
Emergency plan: Develop emergency plans for leaks, fires, electric shocks, etc., and conduct regular drills.
PPE management: Ensure that protective equipment (gloves, goggles, lab coats) is sufficient, compliant, and used correctly.
Waste management: classified collection, compliant disposal (especially hazardous waste).

 楼主| 发表于 3 天前 | 显示全部楼层
设备与资源管理
  • 预防性维护(PM):制定设备维护计划,延长寿命,减少故障。
  • 使用效率监控:统计设备使用率,优化共享机制或采购决策。
  • 能源管理:关闭非必要设备(如夜间关机)、使用节能设备

 楼主| 发表于 3 天前 | 显示全部楼层
Equipment and Resource Management
Preventive Maintenance (PM): Develop equipment maintenance plans to extend lifespan and reduce failures.
Efficiency monitoring: Statistics on device usage, optimization of sharing mechanisms or procurement decisions.
Energy management: Turn off non essential equipment (such as shutting down at night) and use energy-saving devices

 楼主| 发表于 3 天前 | 显示全部楼层
人员能力与文化建设
  • 培训体系:定期开展技术、安全、SOP、LIMS操作培训。
  • 授权与考核:明确人员能力矩阵,持证上岗。
  • 鼓励改善文化:设立“改善提案”制度,奖励合理化建议(如QC小组活动)

 楼主| 发表于 3 天前 | 显示全部楼层
Personnel Capability and Cultural Construction
Training system: Regularly conduct technical, safety, SOP, and LIMS operation training.
Authorization and assessment: Clearly define the personnel capability matrix and ensure that they are certified to work.
Encourage cultural improvement: Establish a "improvement proposal" system to reward rational suggestions (such as QC group activities)

 楼主| 发表于 3 天前 | 显示全部楼层
改善实施步骤(PDCA框架)
  • 计划(P)

    • 识别问题(如报告延迟、试剂浪费、安全事故)。
    • 设定改善目标(SMART原则)。
    • 组建改善小组(跨职能)。
    • 现状调查与数据分析。
    • 制定改善对策。
  • 执行(D)

    • 实施改善措施(如调整布局、优化SOP、上线LIMS模块)。
    • 培训相关人员。
    • 记录过程。
  • 检查(C)

    • 对比改善前后数据(如周转时间、错误率、成本)。
    • 评估目标达成情况。
    • 收集团队反馈。
  • 处理(A)

    • 标准化:将有效措施纳入SOP或管理制度。
    • 推广:在其他实验室或区域复制成功经验。
    • 总结:形成案例,参加发表会。
    • 持续改进:进入下一个改善循环。


 楼主| 发表于 3 天前 | 显示全部楼层
Improvement Implementation Steps (PDCA Framework)
Plan (P)
Identify issues (such as report delays, reagent waste, safety accidents).
Set improvement goals (SMART principle).
Establish an improvement team (cross functional).
Current situation investigation and data analysis.
Develop improvement measures.
Execute (D)
Implement improvement measures (such as adjusting layout, optimizing SOP, and launching LIMS module).
Train relevant personnel.
Record the process.
Check (C)
Compare the data before and after improvement (such as turnover time, error rate, cost).
Evaluate the achievement of goals.
Collect team feedback.
Processing (A)
Standardization: Incorporate effective measures into SOPs or management systems.
Promotion: replicate successful experiences in other laboratories or regions.
Summary: Form a case study and participate in the presentation.
Continuous improvement: Enter the next improvement cycle.

 楼主| 发表于 3 天前 | 显示全部楼层
成功关键与挑战
  • 高层支持:提供预算、时间和政策支持。
  • 全员参与:不仅是管理层的责任,一线人员是改善的主体。
  • 数据驱动:用数据说话,避免主观判断。
  • 避免形式主义:改善要落地,重实效而非只做文档。
  • 持续投入:改善是长期过程,非一蹴而就

 楼主| 发表于 3 天前 | 显示全部楼层
Key to Success and Challenges
Senior support: Provide budget, time, and policy support.
Full participation: It is not only the responsibility of management, frontline personnel are the main body of improvement.
Data driven: Speak with data and avoid subjective judgments.
Avoid formalism: Improvements should be implemented and focus on effectiveness rather than just documentation.
Continuous investment: Improvement is a long-term process, not an overnight success

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|QPDCA平台自律公约|QPDCA质量论坛 ( 苏ICP备18014265号-1 )

QPDCA质量论坛最好的质量管理论坛 GMT+8, 2025-9-29 06:30 , Processed in 0.120265 second(s), 13 queries , Gzip On.

无锡惠山区清华创新大厦901室0510-66880106

江苏佳成明威管理咨询有限公司 版权所有

快速回复 返回顶部 返回列表