找回密码
 立即注册

QQ登录

只需一步,快速开始

查看: 9725|回复: 78

【出差故事】Oversea jobs(English)

  [复制链接]
发表于 2014-4-7 21:05:49 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转质量管理社区。

您需要 登录 才可以下载或查看,没有账号?立即注册

×
本帖最后由 DannyMa2012 于 2017-8-12 06:43 编辑

     Beacon Projects(2RT,  4RT& Inverter) in New Hampshire, West Lebanon(WL), USA, during Aug 20th to Aug 31st,2012;
MIGGUN Project and HARNESS Project in Hermosillo, Mexico during Sep 3rd to Sep 13th,2012.

     To learn the building, testing, Quality Inspection Plan (QIP) for all the above projects , as me a project responsible and participant, focused on the testing, quality assurance for all the projects, then especially have key processes/procedures together with teamwork to push the First Article Inspection (FAI), Pre-production(PP) and mass production go smoothly in our Ningbo plant when I contributed to VT, it’s also the goal that I joined VT starting the 5th day.
    To inspect incoming material sampling with Documents supported such as Visual Color, inspection Standard, Tooling Calibration, PCB inspection, Quality Inspection Sheet(QIS),Quality Level clear identification and so on, also I need check Bill of Materials (BOM) together with drawing(DWG) firstly, then built samples to Incoming Quality Control (IQC) with comparison pictures/standard when necessary and they will be better and so helpful; Process Control,Final Quality control(package included) & shipment, especially I should pay more attention to Critical To Quality( CTQ) items ; Also knew the process of Nonconforming(NCR) Product handling and quality status follow up; Evaluated Quality Records(Record retention times& storage of quality record) and it’s so important.
    Based on the above almost same procedures learned,  In WL, I made a“PCB Rework Process” which learned from Robin who was so nice,draft plant own suitable procedures according to Burn-in & Welding test Procedures which learning from Tom and David; In Mexico, I tested & assembled Harness and also summarized 5 Types for MIGGUN Connectors as T: TWECO,M: MILLER,L: LINCOLN,X/XE: EURO-KWICK,H: HOBART, and concluded that Euro-kwick was different in assembly process and others are almost the same expect the connectors.
     Spent most of my times on checking QIS,  learning the process audit and final audit procedures, then reviewing the data sheet of NCR, Customer Complaint(CC), Scrap, FTT, DPM,FAI and also the details of corrective action from CC, in another side, I need note some maintenance Procedure for related testing equipments and taken back to plant for related personals’attention.
Generally speaking, this was a wonderful and memorable experience for the oversea job in the short one month.

【出差故事】 海外工作经历(中文)
http://www.qpdca.com/forum.php?mod=viewthread&tid=127129&fromuid=6735
(出处: QPDCA质量论坛)

点评

500Q豆已发  发表于 2014-4-7 21:17

评分

5

查看全部评分

 楼主| 发表于 2014-4-7 21:08:23 | 显示全部楼层
本帖最后由 DannyMa2012 于 2014-4-7 21:10 编辑

I have no idea whether I need share the article like this or others, pls give me some advice, thanks!我不知道这样分享可不可以,请给我些建议,谢谢!


发表于 2014-4-7 21:09:29 | 显示全部楼层
你弄个英文版,有特色,但是有些会员看起来吃力啊
 楼主| 发表于 2014-4-7 21:11:50 | 显示全部楼层
Q168 发表于 2014-4-7 21:09
你弄个英文版,有特色,但是有些会员看起来吃力啊

到时候整理下,来个中英文一起吧
发表于 2014-4-7 21:16:16 | 显示全部楼层
出国啊,这个经历挺好!
发表于 2014-4-7 21:17:51 | 显示全部楼层
Q168 发表于 2014-4-7 21:09
你弄个英文版,有特色,但是有些会员看起来吃力啊

应该大部分人会看得懂。
 楼主| 发表于 2014-4-7 21:21:56 | 显示全部楼层
ccsspp454 发表于 2014-4-7 21:16
出国啊,这个经历挺好!

嘿嘿,还好,进这家公司主要是弄这个,今年年后又接了好多个
 楼主| 发表于 2014-4-7 21:23:17 | 显示全部楼层
ccsspp454 发表于 2014-4-7 21:17
应该大部分人会看得懂。

听黄老师建议吧:
要么英文版单独弄一份,中文版一份,抓重点描述这次出差
后续慢慢整理这个,今天有点晚了
发表于 2014-4-7 21:50:10 | 显示全部楼层
看了个大概,
不错的机会,可贵的收获~
发表于 2014-4-7 22:24:30 | 显示全部楼层
我可以说,我看不懂吗

我羡慕楼主这么好的英语水准
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|QPDCA平台自律公约|QPDCA质量论坛 ( 苏ICP备18014265号-1 )

QPDCA质量论坛最好的质量管理论坛 GMT+8, 2024-4-28 20:28 , Processed in 0.237249 second(s), 17 queries , Gzip On.

无锡惠山区清华创新大厦901室0510-66880106

江苏佳成明威管理咨询有限公司 版权所有

快速回复 返回顶部 返回列表